INFRASTRUCTURE SOLUTION
TBM soft-eyes • Launch and reception shafts • Diaphragm wall zones • Secant pile zones
ENGINEERING NOTE
Every tunnel application requires review of structural design, fire, temperature, cover, resin properties and project approval.

IN PRACTICE
GFRP is the global standard for TBM soft-eyes: strong enough to retain the shaft, soft enough for the cutterhead to bore straight through. No steel cutting, no stoppage, no cutter damage.
In permanent works, GFRP solves stray-current corrosion — the chronic failure mode of electrified rail infrastructure — because it is completely dielectric.
Where it’s used
TBM soft-eyes
Machine bores directly through the wall
Launch & reception shafts
Temporary works with fast breakout
Diaphragm wall panels
Cuttable panels at tunnel interfaces
Track slabs & signalling zones
Dielectric — no stray-current corrosion
100%
TBM-cuttable — no manual breakout
Days
saved per shaft breakthrough
Zero
stray-current corrosion risk